ENGINEERING SOLUTIONS FOR HOSPITALITY

Ventilation and air conditioning for hotels and aparthotels

SM Systems designs and installs ventilation, air conditioning and heating for hotels and aparthotels: from guest rooms to shared areas, restaurants and spas. We coordinate quiet operation, hot water, occupancy-based control and service access, and hand over verified operating modes and documentation.

24/7 operation
Guest rooms · spa · restaurant · service areas
Guest comfort and controlled operation
Modern hotel room with discreetly integrated ventilation
A comfortable guest room with quiet, discreetly integrated building services.

A hotel operates as one integrated engineering system

A hotel is not a residential building with a large number of bedrooms. It operates around the clock, has constantly changing occupancy and brings together guest rooms, bathrooms, corridors, a lobby, a restaurant, conference rooms, a laundry, a spa, plant rooms and staff areas. Each zone has its own schedule, loads, odours, noise levels and reliability requirements.

Guests judge quietness, fresh air, temperature, the absence of odours and the availability of hot water—not the type of equipment. Owners also assess operating costs, room downtime, maintainability and the system’s ability to operate at different occupancy levels.

Ventilation affects heating and cooling demand, extract air draws air in from surrounding areas, hot water creates peak loads, and the restaurant and laundry operate on different schedules from the guest rooms. A well-designed solution coordinates all systems around operating scenarios, rather than making each work in isolation.

Hotels and aparthotels have different patterns of use

ParameterHotelAparthotel
Length of stayUsually short staysLonger stays
Guest turnoverFrequentLess frequent
In-room kitchenUsually absent or minimalOften a kitchenette or full kitchen area
LaundryCentral laundry or laundry serviceLaundry appliances may be provided in apartments
ControlsHighly dependent on the PMS and room statusGreater user control
Ventilation loadGuest room and bathroomGuest room, bathroom, kitchen and domestic appliances
Utility meteringBy building and departmentMay be required for individual apartments
OperationHotel staffMixed hotel and residential model
Odour risksBathrooms, corridors, restaurantAlso cooking in guest rooms
Equipment operating patternFrequent changesLonger continuous operation

A property’s name is no substitute for analysing its actual operating model. Some aparthotels operate like conventional hotels; others are closer to serviced accommodation. Actual processes determine ventilation, metering, controls and equipment access rules.

What to establish before selecting equipment

Property and occupancy

  • number, categories and floor areas of guest rooms;
  • number of storeys, building blocks, new build or refurbishment;
  • seasonality, hotel class and peak occupancy.

Facilities within the complex

  • restaurant, kitchen, bar and banqueting halls;
  • spa, swimming pool, saunas, fitness facilities and laundry;
  • car park, administrative and plant areas.

Schedules and operator

  • check-in, housekeeping and night mode;
  • floor closures and periods of low demand;
  • limits on guest control, noise and standby capacity requirements.

Architecture and servicing

  • façades, shafts, ceilings and outdoor unit locations;
  • air intakes, discharge points and service access routes;
  • ability to replace equipment without dismantling interior finishes.

This stage establishes the HVAC design brief, not a list of brands.

One building—many different operating modes

ZoneThe main engineering challenge
Hotel guest roomQuietness, individual comfort, fresh air
Guest room bathroomConsistent extract ventilation, no odours or excess moisture
CorridorControlled airflow without odour transfer
LobbyVariable footfall and the impact of entrance doors
RestaurantGuest comfort and kitchen extract make-up air
Commercial kitchenHeat, steam, grease, odours and fire safety
Conference roomRapid changes in occupancy
Spa and swimming poolHumidity, dehumidification, corrosion and condensation
LaundryMoisture, heat, extract ventilation and process loads
FitnessHigh heat and moisture gains
AdministrationOffice operating schedule
Plant roomsReliability and maintenance access
Car parkPollutant control and dedicated controls
Apartment with kitchenOdours, moisture and domestic loads
A hotel cannot be designed as a collection of identical spaces. Even repeated room layouts differ in façade orientation, floor, category, area and actual use.
Modern hotel corridor with integrated ventilation systems
Corridors and lift lobbies require their own air balance and quiet system operation.
Ventilation design model for a restaurant, conference area and kitchen in one building
Design model of a building with a restaurant, conference area and kitchen. The combined view shows service routes through adjoining spaces and helps coordinate services in zones with different operating schedules and air change requirements.

A guest room should be comfortable, with unobtrusive building services

Comfort depends on temperature, air quality, humidity, air velocity and acoustics. The system should not blow air onto the bed, emit light or noise at night, or require guests to understand a complex controller.

Five criteria for a guest room

  1. Temperature: individual control within reasonable limits and rapid preparation before check-in.
  2. Fresh air: a calculated supply rate that does not depend on an open window.
  3. Humidity: managing risks associated with dry air, condensation and prolonged periods out of use.
  4. Air movement: draught-free distribution around the bed and work area.
  5. Acoustics: night mode, low air velocities, vibration isolation and checks in adjoining rooms.

Before fitting out all rooms, it is useful to build a mock-up room and take measurements under actual operating conditions.

Ventilation and pressure relationships protect against odours

Supply air enters the clean area of the guest room, flows towards the bathroom and is removed by extract ventilation. Corridors, guest rooms, bathrooms, kitchens, laundries and plant rooms must form a predictable pattern of pressure relationships.

Extract ventilation cannot be considered separately from make-up air. Insufficient supply air draws odours through doors, shafts and gaps, impairs extract performance and creates draughts. For apartments with kitchens, cooking must be included as an operating scenario, with checks to ensure that local extraction does not upset the air balance of the entire floor.

The suitability of enthalpy recovery for winter and summer efficiency is verified by calculation.

Conceptual 3D ventilation diagram for hotel public halls, showing main ducts and ceiling air terminals
Ventilation concept for the hotel's public rooms: main ducts branch out to ceiling air terminals in different spaces. This illustrates the design of communal areas, not the ventilation layout for guest rooms.

Heating and cooling are selected to suit operating scenarios

The choice depends on scale, simultaneous heating and cooling demand on different façades, refrigerant restrictions, maintenance arrangements, access to rooms, redundancy and part-load operation.

SolutionsSuitable applicationsAdvantagesWhat to check
VRF/VRV with separate ventilationMedium-sized and large hotels with multiple zonesIndividual control, phased commissioningRefrigerant in occupied spaces, winter operation, maintenance and simultaneous operating modes
HVRFProperties where reducing the refrigerant charge in guest rooms is appropriateWater circuit in occupied spaces, heat recoveryModule locations, hydraulics, cost and maintenance expertise
Chiller–fan coil systemsLarge complexes with centralised operationWater distribution, scalability, different heating and cooling sourcesHydraulics, fan coil noise, condensate, standby capacity and part-load operation
Decentralised heat pumpsSmall properties, individual buildings or phased refurbishmentIndependent zones and simpler phasingOutdoor units, acoustics, defrosting and separate ventilation
Central air systemLobbies, conference rooms, restaurants and large public areasSimultaneous air supply and handling of thermal loadsZoning, duct space, acoustics and part-load operation

Read more about VRF, HVRF, chiller–fan coil systems and heat pumps.

Public and specialist areas

Lobbies and conference rooms require a rapid response to changes in occupancy. The restaurant and commercial kitchen have their own extract ventilation, make-up air and fire response sequences. The laundry requires moisture and heat removal, and its process extract systems must not upset the building's air balance.

Indoor hotel swimming pool with integrated ventilation and dehumidification
The spa and swimming pool are designed as a separate high-humidity zone with dehumidification and protection of the building fabric against condensation.

Domestic hot water is a separate critical system

The load is determined by the demand profile rather than average consumption: morning and evening peaks, check-ins, the restaurant, laundry and spa, storage volume, circulation and recovery time. Long waits for hot water in guest rooms mean reduced comfort and wasted water and energy.

Managing water-related risks

A complex building needs a documented water management programme covering circuit diagrams, monitoring of temperature regimes, stagnant sections and closed floors, flushing, maintenance and procedures for returning areas to service. Specific parameters are determined by current requirements and a risk assessment.

PMS, GRMS and BMS must perform different roles

LevelRole
PMSTracks bookings, check-ins, check-outs and room inventory status
GRMSControls individual room scenarios: occupancy, key card, lighting, setpoints and preparation
BMSCoordinates central plant, pumps, heating substations, alarms, trends and energy consumption

The systems exchange status information, but equipment protection remains at the appropriate local level. Key scenarios should be defined before programming: vacant room, booking, preparation, check-in, housekeeping, open window, fault and removal of a room from sale.

Read more about HVAC automation and BMS, centralised monitoring and control and the digital building passport.

Energy use should match actual occupancy

A hotel rarely operates with the same load in every zone. Savings start with operating modes: occupied room, vacant room, preparation, closed floor, night-time lobby, conference event and a separate restaurant schedule.

Measuring results requires a baseline period, outdoor temperature, occupancy, operating hours and submetering of major energy users. Without context, a single main meter does not show where losses occur.

Reliability is measured by the consequences of failure

SystemConsequences of failureApproach
Domestic hot water supplyComplaints from many rooms and service disruptionSectional isolation, reserve capacity and standby critical pumps
Central heating and coolingLoss of comfort across a floor or buildingModularity, scenario-based redundancy and manual emergency operation
Controls and networkLoss of monitoring or control commandsLocal autonomy, backup power for critical components and an event log
Server rooms and communicationsRisk of digital service downtimeIndependent cooling, alarms and tested recovery procedures
Frost protectionDamage to water circuitsSensors, control logic, backup power and designated responsible staff

Maintenance without disturbing guests

Filters, valves, controllers, drainage and isolation valves must be accessible without dismantling furniture or taking rooms out of service for long periods. Maintenance access routes, spare parts and fault isolation procedures are planned alongside the system.

Refurbishing an operational hotel

Upgrades follow a survey, measurements and analysis of complaints. Work is phased by floor or building and coordinated with the occupancy calendar. Temporary operating modes are prepared, and each phase is inspected and accepted before rooms reopen.

Fire and emergency modes

Fire protection systems, smoke extract, pressurisation, shutdown of general ventilation, lifts and fire service access are coordinated in a single control sequence in accordance with current regulations. General building controls must not override mandatory emergency sequences.

Before opening, verify performance—not just equipment

Commissioning includes air and water balancing, checks of sensors, valves, drainage, protective functions, part-load operation, recovery after power restoration and PMS/GRMS/BMS integrations. Installation and commissioning are completed with test records, not merely by switching the equipment on.

Mock-up guest room

Before rolling out the installation, it is advisable to test one fully equipped guest room: temperature, air exchange, noise in daytime and night-time modes, draughts, condensation, controls and maintenance access.

Operating documentation

  • as-built drawings and equipment documentation;
  • balancing reports;
  • control sequences and alarm matrix;
  • list of setpoints and access permissions;
  • maintenance schedules;
  • staff instructions;
  • software backups;
  • spare parts list.

Essentials and potential over-specification

Essentials

  • correctly sized supply and extract ventilation;
  • quiet zoned operation;
  • reliable hot water;
  • clearly defined guest room operating modes;
  • maintenance access;
  • commissioning and documentation.

Check before purchasing

  • a BMS more complex than the building itself;
  • full redundancy without risk assessment;
  • excessive sensors with no associated actions;
  • expensive system architecture without the expertise to maintain it;
  • metering that nobody uses.

Common mistakes

  1. selecting equipment before defining operating modes;
  2. identical solutions for all façades and room categories;
  3. extract ventilation without make-up air;
  4. equipment above the bed without maintenance access;
  5. ignoring night-time noise;
  6. sizing hot water provision for average rather than peak demand;
  7. cooling vacant rooms as if they were occupied;
  8. direct control of equipment protection functions from the PMS;
  9. no operating mode for a closed floor;
  10. acceptance without balancing and functional testing.

Compare the full life cycle

The initial price does not reflect the costs of energy, water, maintenance, filters, spare parts, room downtime and upgrades. Two proposals can only be compared once their design assumptions and intended outcomes are aligned.

What to compare in proposals

  • list of zones and design operating conditions;
  • ventilation and make-up air for extract systems;
  • simultaneous heating and cooling;
  • hot water and recirculation;
  • acoustic criteria;
  • redundancy;
  • PMS, GRMS, BMS and metering;
  • electrical supply and associated works;
  • balancing and commissioning;
  • maintenance access and documentation.

The first stage may be a new design or a survey and phased upgrade of an existing building.

Questions and answers

Yaroslav Smolko · SM Systems · Updated 23 September 2026

HVAC AI

Prepare a brief for your hotel or aparthotel

HVAC AI will clarify the guest room provision, functional areas, occupancy levels and requirements for quiet operation, hot water, controls and maintenance.

SM SYSTEMS LLC+380 44 232 19 32