Technical preparation
We review the design, technical brief and specifications. We check design principles, capacities, routing, controls, maintenance access and interfaces with other disciplines.
Commercial buildings
Ventilation, air conditioning, heating and automation for business centres, offices, retail premises, hotels, restaurants and other buildings.
We design, procure and install systems, coordinate related works, carry out commissioning and hand over the system for operation.
Team experience since 2013 · A single point of responsibility
Scope of works
We can join a project at any stage, from new construction and refurbishment to a specific complex HVAC package. We define the scope of works after reviewing the documentation, technical requirements and project objectives.
We review the design, technical brief and specifications. We check design principles, capacities, routing, controls, maintenance access and interfaces with other disciplines.
We define the equipment, materials and works required. We document exclusions, related works, timescales, pricing assumptions and the procedure for approving changes.
We supply equipment and materials, agree technical substitutions and check component compatibility and completeness of supply for the project.
We install the agreed HVAC systems and coordinate works with the main contractor, designers, architects, electricians, builders and controls specialists.
We start up the equipment, check operating modes, configure controls, balance the systems and rectify any deviations identified.
We hand over as-built documentation, key parameters and operating information. We provide warranty support and can continue with planned servicing.
Completed projects
In the Projects section, we present the facility type, actual scope of works, technical challenges and our responsibilities in delivery.
Controls
We integrate controls, supervisory monitoring and data-driven algorithms into a single system. It analyses actual equipment operation, identifies inefficient operating modes, accounts for loads, weather and building operating schedules, and automatically adjusts control.
The result is lower operating costs, more precise control of conditions and less reliance on manual adjustments.
Discuss your project →Practical experience
Solution by application: shopping and entertainment centre ventilation.
Systems and services: HVAC design; HVAC project delivery; HVAC maintenance; ventilation systems; VRF and DX systems; chiller–fan coil systems; HVAC automation.
Expert articles
Where responsibilities lie across design, supply, installation, other trades and system start-up.
Read →Starting up equipment does not mean the system is ready for full operation.
Read →Why reliable system operation depends on the entire sequence of decisions, not just the equipment brand.
Read →FREQUENTLY ASKED QUESTIONS
HVAC AI
With a few questions, HVAC AI will gather details of the facility type, floor area, project stage, systems and delivery requirements.